700 sq ft of structural repairs and waterproofing across three oversized balconies in accordance with the approved SB 721 Engineering Report. The project upgraded the assemblies to meet current California Building Code requirements and restored structural integrity following long term water intrusion.

Project Duration: Approximately 8 Weeks

Key challenges overcome:

Structural Restoration: Resolved extensive concealed water damage by replacing deteriorated framing, installing missing door pans, and reconstructing the waterproofing systems.

Lead-Safe Practices: Safely managed lead-based paint under full EPA RRP compliance, utilizing strict containment, dust control, and proper waste disposal procedures.

● Occupied Logistics: Secured units with temporary weatherproof containment while doors were removed, maintaining proactive communication to complete the project with zero resident or neighbor complaints.

● Material Handling: Carefully sequenced the safe removal, scaffold lowering, and re- hoisting of existing galvanized guardrails to facilitate the structural repairs.