1,200 sq ft of structural balcony repairs completed in accordance with the SB 721 Engineering Report. These repairs included waterproofing, framing replacement, and structural reinforcement to meet current California Building Code requirements and restore the balconies to a safe condition.
Project Duration: Approximately 6 Months
Key challenges overcome:
● Concealed Structural Damage: Addressed extensive dry rot found during demolition by collaborating with engineers to revise plans and executing phased repairs.
● Environmental Compliance: Safely managed lead and asbestos under full regulatory compliance, utilizing licensed abatement contractors, strict containment, and proper disposal protocols.
● Occupied Logistics: Coordinated proactively with Property Management to safely manage restricted access and minimize disruption in a fully occupied building.
